1. HOTEL INTER-CONTINENTAL - 111 E. 48th St., New York, NY - New 900 Ton Chiller Water System.
The Central Plant located in the Metro-North platform below the hotel.
The project includes new riser, cooling towers and guestroom hvac units. $15 Million.
Customer contact Mr. Eddie Robinson, The John Hardy Group.
2. GOLDMAN SACHS - 85 Broad St., New York, NY - New Plate frame heat exchanger free cooling system
$1million contact Joseph Tranchina
3. LEHMAN BROTHERS - 2WTC New York, NY - Replace tenant condenser water system piping.
$450,000.00 Contact Mr. Robert Maffia
4. THE FORD FOUNDATION - 321 E. 43rd St., New York, NY - Replace building Generator system
$450,000.00 Contact Mr. Hank DePerro
5. COLUMBIA UNIVERSITY, HEALTH SCIENCES - 168th St., New York, NY - Replacement of a 3200 ton chilled water plant
converting from steam turbine to electric centrifugal chillers.
$4.5 million contact Bill Marshand 212-305-32909
6. COLUMBIA UNIVERSITY, COLLEGE OF PHYSICIANS & SURGEONS - New York, NY - New electric service
from the street including excavation for property line boxes, transformers, and swithcgear.
$1.75 million contact Mr. Bill Marshand 212-305-3290
7. COLUMBIA UNIVERSITY, HAMMER BUILDING New York, NY - New 1000 kW building generator.
$1.2milliion contact Bill Marshand 212-305 3290 Completed July 2000
8. PFIZER, INC. PHASE I - New York, NY - Installation of 1000 Ton Chiller Plant
located in the basement under sidewalk vault of mid-town, owner occupied office building.
Including new 12 story chilled and condenser water risers and air handlers $3 million.
Contact Mr. Joel Parisy (212) 733-4246
9. PFIZER, INC. PHASE II New York, NY - Installation of base building AHU system.
$1.2 million. Contact Mr. Joel Parisy (212) 733-4246
10. THE MOBIL BUILDING - 150 E 42nd St.New York, NY - 4500 Ton Chiller Plant Replacement
located in the sub-basement of an occupied NYC high rise office building $6 Million.
Customer contact Mr. Joseph Tranchina (212) 843-4037
11. 14 WALL STREET - New York, NY - 200 Ton Chiller Replacement & Plate Heat Exchanger Installation
in a 24 hour, 7 days a week operating computer system chiller plant
located on the 27th floor of a downtown high rise office building $375,000.
Customer contact Mr. Joe De Silva (212) 233-3444.
12. 111 JOHN STREET New York, NY - New Cooling Towers
located on the 30th floor of an occupied downtown NYC office building, $250,000.
Customer contact Mr. Robert Barriero
13. ST. MORITZ HOTEL New York, NY - Replacement of new HVAC system
located in the sub-basement of an operating mid-town NYC Hotel, $260,000.
Customer contact Mr. John Rizzo Tishman Hotel Corp. (212) 446-5571.
14. OIL & GAS BUILDING Fort Worth, TX - 1000 Ton Chiller Plant Replacement
located in the sub-basement of an occupied out-of-town high rise office building.
Extremely fast track because of short shut-down period (December-February)
$ 750,000. Contact Ms. Dana Dunlap PM Realty (817) 429-3361
15. BANK OF NEW YORK - 48 Wall St., New York, NY - Convert 20th floor office space in a downtown office building
to a new 30,000 chiller fan room, $350,000. Customer contact Bob Kaiser.
16. THE BYRON HOUSE New York NY - Installation of a new 200 Ton Multi-Stack chiller plant
located in the basement of an occupied, mid-town co-op residential property
and the replacement of the cooling tower located on the 18th floor, $460,000.
Customer contact Mr. Tim Grogan, John J. Grogan & Associates, Inc. (212) 697-2180
17. 14 WALL STREET - New York, NY - Installation of new Indoor Cooling Towers
in an occupied downtown high rise office building $160,000.
Customer contact Mr. Joe De Silva (212) 233-3444.
18. 61 BROADWAY - New York, NY - Base Building Mechanical Upgrade $360,000.
Customer contact Mr. Robert Barriero (212) 269-6890
19. PARROT CAY HOTEL - Turks & Caicos Islands - Power Plant and Chiller relocation
at new five star hotel located n the southern Bahamas. $350,000 contact Pan Gulf Energy. Neil Skidell 212-869-5584
20. GRAND PALAZZO HOTEL - St. Thomas, U.S.V.I. - Villas Utility Space Ventilation and Laundry area
20 Tons Air Conditioning System in a operating five star resort hotel $120,000.
Customer contact Lou Lalli (212) 947-8050. Lars Hoglundt (809) 775-333, Chief Engineer.
21. ONE NEW YORK PLAZA - New York, NY - Installed a 600-Ton temporary chilled water plant
located on a NYC street and piped into the building to supplement the base building system.
$2.5 Million. Customer contact Goldman Sachs Mr. Brendan Connolly
22. ONE NEW YORK PLAZA - New York, NY - Installed new 600-Ton Emergency Chiller System
for Goldman Sachs world headquarters computer center. $460,000 Contact Brendan Connolly
23. 29 BROADWAY - New York, NY – Replaced two (3) 300 ton absorption chillers
located in the basement of an operating NYC office building with new electric chillers. $350,000.
24. COLUMBIA UNIVERSITY, HEALTH SCIENCES - 168th St., New York, NY - Replaced the existing 25 stories
of 24” condenser water risers with new risers installing the new risers inside the existing risers.
$1.5 Million Contact Mr. Bill Marchand
25. 140 BROADWAY - New York, NY - Installed Immune Building System’s
Ultraviolet Germicidal Irradiation System – Pilot program on one AHU. $10,000 Contact Joe Ritorto
26. RANDOM HOUSE PUBLICATIONS - 1745 Broadway New York, NY - Installed Immune Building System’s
Ultraviolet Germicidal Irradiation System –$280,000. Contact Joe Ritorto
27. 770 PARK AVENUE - New York, NY - Installed a new PRV Steam Station
in an occupied luxury high-rise apartment building - $468,000. Contact Peter Brown
28. METROPOLITAN HOTEL - New York, NY - 700 Hundred Room Hotel located on Lexington Ave, NYC –
Replaced Existing two pipe fan coil system with a new four pipe fan coil system
including all new risers in an operating hotel. $2.5 Million Contact Doug Castoldi DKS Construction
26. Random House Publications - 1745 Broadway New York, NY - Installed Immune Building System’s
Ultraviolet Germicidal Irradiation System –$280,000. Contact Joe Ritorto
29. COLUMBIA UNIVERSITY HEALTH SCIENCES - 168th St., New York, NY - Replaced existing fuel oil tanks
and constructed a new fuel oil containment system. $675,000 Contact Bill Marchand
30. HOTEL INTER-CONTINENTAL - 111 E. 48th St., New York, NY - New Steam Condensate Hot water System
and New Kitchen Exhaust System. $400,000
31. 77 WATER STREET - New York, NY - Replaced 1000 Ton Absorption Chiller
in 30th Floor machine room of an occupied office building. $1,000,000. Contact Joe Tranchina
32. HILTON HEAD BEACH GOLF RESORT Hilton Head, SC - New 1200
Ton chiller plant, replacement public area air handlers, 600 room
fan coil unit modification and room finishes. $7 Million.
33. WYNDHAM MYRTLE BEACH Myrtle Beach, SC - Room fan coil unit
change out, fire safing and room finishes for 88 rooms. $1.5 Million.
34. GOLDMAN SACHS 1 New York Plaza, NY - Insulation of new 1200
Ton Supplemental Chiller Plant on 21st Floor set back. $3 Million.
35. THE MARK HOTEL 77th Street and Madison Avenue, NY - 100
Ton Rooftop Air Cooled Chiller.
|